Corrosion protection tapes.
Complete wrapping systems.
Petrolatum, viscoelastic, microcrystalline wax, PP / PE and aluminium foil tapes — with the primers, mastics and outer protection that complete your specification.
Five systems
Every technical data sheet on this site is free to download, without a form and without registering — including the third-party test report behind each product.

Petrolatum Anti-Corrosion Tape
The reference cold-applied system for tank bases, valves, flanges and complex steel. Marine, industrial and seawater grades.

Viscoelastic Tape and Paste
Permanently non-curing polymer that cold-flows into the surface profile. No primer, no cathodic protection shielding, zero VOC.

PE and PP Pipeline Tape
Bitumen-adhesive polyolefin tape for buried steel pipelines. Works as the primary wrap and as a protective outer wrap.

Microcrystalline Wax Tape
For severe, humid, buried and immersed service. Tested against the ASTM and AWWA C217 method set used internationally for wax tape.

Protective Outer Wraps
Aluminium foil for UV and above-ground exposure; PE and PP for buried and mechanically loaded service. Specified for the actual exposure.

Primers, Mastics and Pastes
Primers for horizontal, vertical and overhead work; filling compounds for bolt recesses, weld caps and chime edges.
Which system for which asset
A first-pass guide only. Final selection depends on substrate condition, environment, temperature, geometry and mechanical exposure — and on the project specification, which always takes precedence.
| Application | Petrolatum | Viscoelastic | Wax | PE | PP | Aluminium |
|---|---|---|---|---|---|---|
| Tank annular plate / chime edge | P | S | S | – | – | O |
| Valve, flange and irregular detail | P | P | S | – | – | O |
| Buried pipeline rehabilitation | S | P | S | S | P | – |
| New buried steel pipeline | S | S | S | P | P | – |
| Above-ground exposed steel | P | S | S | – | – | P |
| High mechanical soil stress | A | A | A | S | P | – |
| Submerged, tidal and splash zone | P | S | P | – | – | – |
| Shipboard pipework and fittings | P | S | S | – | – | S |
Modular, not a fixed four-layer recipe
Components are selected and combined for the asset. Not every system uses every component: some viscoelastic configurations need no primer, filling compound is used only where the geometry is irregular, and the outer wrap is chosen for the exposure — or omitted where there is none.
Each application page shows the sequence drawn in section, stage by stage, with the products and figures taken from the corresponding solution document.
See the sequences in sectionPrimer
Wets the prepared steel and inhibits corrosion at the interface.
Mastic / paste
Fills gaps, bolt recesses and weld caps so the wrap makes continuous contact.
Corrosion tape
The continuous barrier against water, vapour, oxygen and corrosive media.
Outer wrap
Resists UV, weather, soil stress, handling and mechanical damage.
Which corrosion protection tape system should you specify?
Choose by asset, exposure and the complete layer system. Petrolatum grease tape, viscoelastic tape and wax tape are different material families; a matching outer layer and approved application procedure remain part of the selection.
| Material family | Application starting point | Confirm with the technical team |
|---|---|---|
| Petrolatum grease tape | Tank chimes, valves, flanges and complex steel details | Industrial, shipboard marine or seawater grade; matching primer, mastic and outer protection |
| Viscoelastic tape and paste | Pipeline coating repair and irregular geometry | Temperature, existing coating, paste requirements and mechanical outer protection |
| Microcrystalline wax tape | Maintenance wrapping of pipework and steel details | Grade, primer and the test methods required by the project specification |
| PE and PP pipeline tape | Buried steel pipelines and protective wrapping | Primary or outer-layer role, matching primer, overlap and mechanical exposure |
| Protective outer wraps | Protection of the underlying corrosion-control layer | UV, handling, soil or marine exposure and compatibility with the complete system |
Use the asset selection guide and published technical documents to check the proposed configuration. For procurement, review the supplier qualification checklist.
Send us the asset, we will propose the system
Asset type, dimensions, operating temperature, exposure and estimated quantity are enough for us to return a system configuration, a material estimate and the supporting documents.